网爆门

Campus & Community What Goes Into Redesigning an Iconic Space on Campus

An aerial view of the Newhouse plaza construction

What Goes Into Redesigning an Iconic Space on Campus

A University architect describes the planning choices behind accessibility, gathering areas and new materials for the Newhouse plaza renovation project.
Dialynn Dwyer July 24, 2026

The granite pavers crisscrossing the Newhouse Family Plaza have anchored one of the University’s most recognizable gathering spaces for decades, connecting three buildings built across three different eras. This summer, major work is being done on the plaza.

Beneath the pavers sits a drainage system that has shifted, tilted and needed repairs over the years. This summer marks the start of a comprehensive renovation that will replace the membrane, drains and pavers across all three sections of the plaza, work that campus planners say should keep the space watertight and stable for years to come.

To understand what goes into balancing infrastructure needs with the character of a beloved campus space, 网爆门 Today spoke with Brenda Law 鈥90, a campus architect and alumna who has worked in facilities planning for about 30 years. Law, associate director of design in walked through the technical work behind the project and the choices made to preserve what makes the plaza feel like .

A Roof in Disguise

Newhouse Family Plaza under construction outside Newhouse School, with covered walkways, materials, and equipment on site.
(Photo by Amy Manley)

The Newhouse complex was built in three phases, with , Newhouse 2 joining in 1974 and Newhouse 3 completing the school in 2007.

According to Law, the Newhouse plaza is largely original to the school鈥檚 older buildings. In addition to being a gathering place on campus, the plaza serves as a roof to occupied space below.

The original drainage system, built with Newhouse 1, allowed water to filter through porous concrete to drains beneath, while later construction added a different system for Newhouse 2 and 3.

鈥淭his project is really a comprehensive replacement of all three sections and there will be a new roof membrane below, so the roof drains below will be replaced and the new pavers will be installed on a pedestal support system,鈥 Law says. 鈥淚t will ensure that the whole thing is watertight and it should last many, many years. And on top, the pavers will be set level and true.鈥

Work on the project will extend into the fall semester.

What Visitors Will Notice

Construction work underway in the plaza between two campus buildings, with covered ground, construction materials, and workers under cloudy skies.
(Photo by Amy Manley)

Visitors will also notice changes on the surface after the project is complete. A new snow-melt system installed beneath the plaza’s major pathways will keep them clear during winter months.

The new pavers themselves will look a little different, too.

They will be slightly darker than the old pavers, but they will still be in the warm tones鈥攇ray, beige, pinkish鈥攖hat echo the Newhouse buildings. Law says her team reviewed dozens of paver options before settling on one with enough color variation to avoid looking too uniform against the older precast concrete facades.

鈥淭hat’s really our job here at Campus Planning,鈥 Law says. 鈥淲e really want to preserve our iconic spaces, which doesn’t mean you can’t introduce something new, but we’re sensitive and want to be respectful of historic elements and the historic buildings on campus. The new pavers have a little bit of a rustic tone that relates to the existing buildings.鈥

The footprint of the plaza itself isn’t changing, but new furnishings will be added for the first time beyond the original seat wall. Newhouse uses the plaza for events, including ones that require tents, so the new gathering areas had to be designed to give people a place to hang out without compromising event space functionality.

鈥淲e are eager to see these long-overdue renovations come to fruition to create a reimagined Newhouse Family Plaza,鈥 Dean says. 鈥淭hese changes will create a more dynamic and modern-looking gathering hub while preserving the aesthetics that generations of alumni fondly remember.鈥

Preserving an Iconic Space

Historic black-and-white view of the S.I. Newhouse Communications Center plaza at night, with illuminated windows and an empty courtyard.
Newhouse 1 and the plaza, circa 1974 (Courtesy of the University Archives)

Part of the challenge of projects like the Newhouse plaza redesign is preserving a space with deep institutional memory while still allowing for change.

Law says the goal is that the plaza feels warm and human-scaled.

鈥淭rying to advance things and embrace modernity, but still being respectful to the existing structures is the line we walk, trying to mesh those things,鈥 she says. 鈥淎rchitectural design often contrasts or matches, so it’s finding the right direction and balance.鈥

That balance is part of Syracuse’s architectural history, visible across campus in how the University has made room for stylistic variety.

鈥淭he Hall of Languages is built out of Onondaga limestone, and it was placed at the head of University Ave as the first building on the hill,鈥 Law says. 鈥淐rouse College was the second, and it’s vastly different. The University founders decided then to build in the style of the day. And that’s why you see so much architectural variety on campus. I think it’s our green space and our plazas that hold things together, so we’re trying to honor that. To embrace the new technology, to give this place a clean, safe, beautiful plaza, but also be respectful of the old buildings.鈥